Fields | 1 | 2 | 3 | 4 | 5 | 6 |
---|---|---|---|---|---|---|
Year | 2022-23 | 2017-18 | 2016-17 | 2016-17 | 2024-25 | |
Budget head | Amruth Nagarothana | GoK | Nagarothana Grants | P-3918 Brand Bangalore-Green Bangalore Grant | ||
Year of Handing over | ||||||
Condition of lake during handing over | ||||||
Name of work | Package -21: Remaining development works at Rachenahalli Lake, Development of Jakkur Lake, Bund development works at Palanahalli & Thirumenahalli Lake, Venkateshpura Lake & Comprehensive development of Singapura Lake | Construction of Silt Trap, culvert at Amruthahalli Lake & side Inlet of Rachenahalli LakeImprovements to wetland in Jakkur Lake (Balance work) | Improvements to Jakkur Lake: Construction of Diversion Pipe line, Inlet Improvements, Silt traps, Wet land improvements, Walk way improvements etc., | Package 9 - 1) Pumping treated water from jakkur lake to tirumenahalli lake and kogilu lake in byatarayanapura assembly constituency.
2) Development of Benniganahalli Lake
3) Improvements to Annappanakere / Yelchenahalli Lake Phase-1.
4) Improvements to Gottigere Lake | Allied works pertaining to wetland works at Jakkur Lake | |
Sanctioned Amount (crores) | 1.10 | 3.00 | 0.00 | 3.00 | 10.00 | 2.00 |
Job code | 308-23-000122 | 308-23-000126 | 308-16-000059 | 308-17-000093 | 308-25-000027 | |
Work order date | 24-03-2023 | 27-03-2023 | 27.10.2016 | 20-03-2018 | 07-12-2024 | |
Work order amount (crores w/o GST) | 0.00 | 2.70 | 0.00 | 2.51 | 0.00 | 1.63 |
Components taken | 1) CONSTRUCTION OF SILTRAP CUM BOX CULVERT TO AMRUTHAHALLI LAKE SIDE INLET AND SILTRAP FOR JAKKUR LAKE SIDE INLET (2 NO).
2) CONSTRUCTION OF SLUICE GATE AT WASTE WEIR -1.
3) PROVIDING SEDIMENTATION TANK
4) PROVIDING SEWAGE DIVERSION PIPELINE AT DAMAGED PORTION.
5) WALKWAY IMPROVEMENTS
6) DE-WATERING, DE-SILTING OF WETLAND, REMOVAL OF DEBRIS
7) PROVIDING BALANCE BOUNDARY FENCING
1) DEWATERING AND DESILT WETLAND - 10Acres.
2) REPAIR OF TOILET BLOCK AND WATER SUPPLY CONNECTION
3) CONSTRUCTION OF CHAIN-LINK FENCING OUTER BOUNDARY
| CONSTRUCTION OF PASSIVE INFLOW WATER TREATMENT AT WETLAND | 1) Deweeding and other amenities (Boards & Dust Bins)
2) 300mm thick Gravel topping for bund
3) Constructions of Ramp at inlets- 2 Inlets
4) Constructions of Ramp at Idol immersion tank
5) Improvements to Chain link Fencing
6) Restoration of toilet block - Water Supply and Sanitary works
7) Provision of gates - 2 Nos
8) Construction of watch tower - 1 no
9) Construction og Gazebo - 2 Nos
10) Stone pergola - 1 No
11) Provision of water storage tanks - 8 Nos
12) Construction of Shed for organic treatment plant
13) Construction of wetland
14) Construction of over head tank - 2 Nos
15) Water Supply and Sanitary works
16) Borewell Sinking, Pump Erection & Energisation
17) Internal electrification work | Construction of Diversion Pipe line, Inlet Improvements, Silt traps, Wetland improvements, Walk way improvements | 1)Pump House Room
2)Pipeline | 1) CONSTRUCTION OF ROCKFILL WETLAND BUNDS
2) PROVISION OF LDPE SHEET FOR ROCKFILL WETLAND BUNDS
3) CONSTRUCTION OF INLET STRUCTURE WITH FLOW DIVERSION WALL
AND SLUICE GATES
4) CONSTRUCTION OF WETLAND OUTLET STRUCTURE
5) IMPROVEMENT TO WALKWAY FOR PERIPHERAL BUND IN WETLAND
AREA |
Billed Amount (crores) | 0.00 | 0.00 | 2.47 | 0.00 | 0.00 | 0.00 |
Date of completion | 30.06.2018 | |||||
Remarks |