Fields 1 2 3 4 5 6
Year 2022-232021-222020-212019-202019-202019-20
Budget head Amrutha Nagorathana Grants15th FinancePOW WorkCM Nava NagorathanaP0541 Emergency FundP0541 Commissioner Discretionary Grants
Year of Handing over UDD/449/BAS/2016 DT:14.09.2016UDD/449/BAS/2016 DT:14.09.2016UDD/449/BAS/2016 DT:14.09.2016UDD/449/BAS/2016 DT:14.09.2016UDD/449/BAS/2016 DT:14.09.2016UDD/449/BAS/2016 DT:14.09.2016
Condition of lake during handing over Undeveloped LakeUndeveloped LakeUndeveloped LakeUndeveloped LakeUndeveloped LakeUndeveloped Lake
Name of work
PACKAGE-7 1) Providing fencing and other improvements work in Sarakki lake 2) Development and Maintenance of Sarakki lake in ward No.187 3) Development and Maintenance of Hulimavu Lake Arkere in ward No.193 4) Development and Maintenance of Arkere Lake in ward No 193 5) Development and Maintenance of Agara Lake in ward No 174 6) Development and Maintenance of Singasandra A Block lake in ward No.191 7) Development and Maintenance of Singasandra B Block lake in ward No.191 8) Development and Maintenance of Somasundra playa lake in ward No.174
Rejuvenetion & Developmental Work to Hulimavu Lake
Development of Hulimavu Lake 1st stage ward no 193
Development of Hulimavu lake & Providing additional improvement works to AECS Layout (Kodige Singasandra lake)
Restoration of Breached bund and allied works at Hulimavu Lake Bengaluru
Construction of RCC Retaining wall, sluice chamber near breached bund, fencing and allied works at Hulimavu Lake Bengaluru
Sanctioned Amount (crores) 12.00 8.00 5.00 10.00 0.98 0.99
Job code 308-23-000115308-23-000121193-21-000013308-21-000041308-20-000102308-20-000101
Work order date 15.03.202321.03.202322.04.202228.12.202121.05.202021.05.2020
Work order amount (crores w/o GST) 10.23 6.65 4.70 8.54 0.90 0.89
Components taken
1.Walkway improvements, 2.Providing water body fencing, 3.Provding & fixing of MS gates
1.Lake bed Improvements 2.Wetland Improvements, Inlet with silt traps
1.Laying of RCC 1200mm 2.Diversion pipe line, 3.Rock Cutting
1.Improvement to Lake 2.Bund Main Bund Formation of Ring Bund,
1.Providing 1200mm Dia Diversion Pipe Line 2.Providing coffer Dam 3 Desilting Near Waste weir 4 Construction of RCC Gravity Wall
1.RCC Retaining Wall From SWD Drain To Waste weir 2. Construction of Sluice Valve Chamber and RCC Weir Wall 3.Chain Link Fencing for Outer Body (near waste wier)
Billed Amount (crores) 1.46 1.13 1.41 4.09 0.85 0.85
Date of completion In ProgressIn Progress21.03.202327.11.202218.01.202218.01.2022
Remarks