Fields 1 2 3 4 5
Year 2023-242022-232020-212017-182016-17
Budget head BBMP Assests of Fencing of LakesAmrutha Nagorathana GrantsImprovements/Development to LakesImprovements/Development to LakesNagarothana
Year of Handing over UDD/449/BAS/2016 DT:14.09.2016UDD/449/BAS/2016 DT:14.09.2016UDD/449/BAS/2016 DT:14.09.2016UDD/449/BAS/2016 DT:14.09.2016UDD/449/BAS/2016 DT:14.09.2016
Condition of lake during handing over Undeveloped LakeUndeveloped LakeUndeveloped LakeUndeveloped LakeUndeveloped Lake
Name of work
Providing Chain Link Fencing to lakes in Bommanahalli Assembly Constituency (Phase-2)
PACKAGE-7 1) Providing fencing and other improvements work in Sarakki lake 2) Development and Maintenance of Sarakki lake in ward No.187 3) Development and Maintenance of Hulimavu Lake Arkere in ward No.193 4) Development and Maintenance of Arkere Lake in ward No 193 5) Development and Maintenance of Agara Lake in ward No 174 6) Development and Maintenance of Singasandra A Block lake in ward No.191 7) Development and Maintenance of Singasandra B Block lake in ward No.191 8) Development and Maintenance of Somasundra playa lake in ward No.174
Development of Sarakki Lake in ward no 186
Development of Sarakki Lake
Package L-7 1. Development of Sarakki lake 2.Development of Annayyappana kere/yelechenahalli lake phase-1 jaraganahalli/puttenahalli. 3. Development of Subramanyapura lake phase -1
Sanctioned Amount (crores) 3.00 12.00 5.00 5.75 10.50
Job code 308-24-000131308-23-000115186-21-000009308-18-000009308-17-000011
Work order date 10.06.2024 15.03.202302.08.202127.06.201813.07.2017
Work order amount (crores w/o GST) 2.45 10.23 4.79 6.15 8.90
Components taken
Construction of Outer body chainlink fencing (725.75 m ) Entrace gate 1 no's
1.SSM Outer Fencing in Elite Bund 2.Construction of Open Amphitheater in park area 3. Formation of Sand walk in mainbud 4.construction of Open yoga Platform 5.Formation of Childeren Play Area in sand bed &Formation of Open Gym area for senior Citizen
1. Improvements to Lake bed 2.Improvements to Bund 3.Hume pile culvert 4.Waste weir Improvement to foot brigde 5.SSM Catch drainnear entrace 6.wetland bund Improvements 7.Inlet bridge 8. SSM wall construction
1. Dewatering of tank 2.Desilting of Main bund 3.Sewage .Diversion Pipeline Drain 4.Inlet improvement with silt trap 5.RCC Precast slabs for drain 6.Hume pipeculverts 7.Revetment to Mainbund and wetland
1. Outer body SSM Fence 2.Wetland Slush Removal 3.Slush lead 4.Bund formation 5.RCC Drain 6.Pipeline
Billed Amount (crores) 0.00 1.46 4.37 6.15 8.90
Date of completion In ProgressIn Progress01.07.202210.04.201930.01.2019
Remarks